PPPH UMPSA
JPPH UMP
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT EBID 389 downloads
1. MUKA DEPAN (1).docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT KERJA 445 downloads
1. MUKA DEPAN SEBUTHARGA.docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT KERJA 469 downloads
2. BORANG SEMAKAN DOKUMEN.docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT EBID 450 downloads
2. ISI KANDUNGAN (1).docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT KERJA 422 downloads
3. ISI KANDUNGAN.docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT EBID 473 downloads
3. NOTIS E-BIDDING (1).docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT EBID 448 downloads
4. DOKUMEN PELAWAAN E-BIDDING (1).docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT KERJA 407 downloads
4. SURAT AKUAN PEMBIDA.docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT EBID 426 downloads
5. ARAHAN DAN SYARAT SEBUTHARGA EBIDDING (1).docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT KERJA 417 downloads
5. NOTIS PELAWAAN.docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT KERJA 464 downloads
6. ARAHAN KEPADA PETENDER.docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT EBID 430 downloads
6. BORANG SEMAKAN DOKUMEN (1).docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT EBID 362 downloads
7. BORANG PENGESAHAN SEMAKAN LOKASI PROJEK (1).docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT KERJA 489 downloads
7. SYARAT-SYARAT SEBUTHARGA.docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT KERJA 402 downloads
8. BORANG JAMINAN PETENDER.docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT EBID 415 downloads
8. RINGKASAN DAN JADUAL HARGA (1).docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT EBID 407 downloads
9. BORANG JAMINAN PETENDER (1).docx
Published on 09 January 2024 Modified on 18 January 2024 In TEMPLAT KERJA 377 downloads
9. RINGKASAN SEBUTHARGA.docx
Published on 09 January 2024 In TEMPLAT KERJA 398 downloads
10. JADUAL HARGA.docx
Published on 09 January 2024 In TEMPLAT EBID 418 downloads
10. SURAT AKUAN PEMBIDA.docx
Pusat Pembangunan & Pengurusan Harta Universiti Malaysia Pahang Al-Sultan Abdullah26600 Pekan Pahang Darul Makmur
Tel: +609-431 5044